Division 01 / Broadcast Integration

Signal-critical environments coordinated as complete systems.

VIDKEY™ coordinates broadcast environments as connected signal paths, operational spaces, and documented infrastructure. Studios, control rooms, production systems, and modernization requirements are considered as one engineered whole.

Discuss Your Project
VIDKEY / SYSTEM ROUTINGBroadcast Integration
  1. 01Requirements
  2. 02Integration
  3. 03Environment

Division capabilities

Systems within Broadcast Integration

01

Studios and control rooms

Rooms, operator positions, monitoring, and control requirements coordinated around the intended workflow.

02

Production and post-production systems

Production and post-production components organized as connected systems with clear interfaces.

03

Signal routing and infrastructure

Signal paths, equipment connections, and supporting infrastructure planned as a documented system.

04

System modernization

Existing requirements and new system needs coordinated into a deliberate modernization path.

Client experience

Selected Broadcast clients

Organizations and facilities represented in VIDKEY’s Broadcast project history.

  • 01

    Broadway Video Inc.

    New York, NY

    Engineering and technical operations across editing, audio post, machine-room, duplication, routing, and multi-location IT systems.

  • 02

    Voom Networks / Rainbow

    Online HD and nonlinear editing facilities.

  • 03

    AMC Networks / Rainbow

    Broadcast systems design consulting.

  • 04

    Eventone Productions / Howard Shore

    Four audio post-production suites and a controlled critical-listening room for music scoring.

  • 05

    The Jewish Channel

    Master-control and editing-suite systems.

  • 06

    Paramount / Showtime / CBS

    Post-production machine room, editing and graphics workstations, media storage, interactive lab, boardroom, master control, and audio quality-control systems.

  • 07

    IMG / MPE

    New York, NY

    Dub-center systems.

How we work

Engineering approach

  1. 01

    Thoughtful engineering

    Requirements, interfaces, and physical conditions are considered as parts of one system.

  2. 02

    Clear documentation

    System intent and coordination details are recorded for the people who plan, build, and use the environment.

  3. 03

    Disciplined project coordination

    Technical decisions are organized across the work so connected systems remain aligned.

Project coordination starts here

Discuss Your Project

Discuss Your Project